Within the FABRIC Project 57 Deliverables are foreseen. These documents reflect the project results and are written and reviewed by the project experts. As soon as the documents are officially released the Public Deliverables (PU) as well as an executive summary of the restricted (RE) ones will be provided on this section
|
Del.No |
Deliverable Title |
Dissemination Level |
Delivery Date |
|
D12.1 |
PU |
M1 |
|
|
D12.2 |
PU |
M1 |
|
|
D13.1 |
PU |
M4 |
|
|
D13.2 |
PU |
M4 |
|
|
D13.3 |
PU |
M4 |
|
|
D13.4 |
PU |
M24 |
|
|
D13.5 |
PU |
M24 |
|
|
D13.6 |
Exploitation plan |
CO |
M48 |
|
D22.1 |
User needs, system concept and requirements for ICT solutions |
PU |
M7 |
|
D23.1 |
PU |
M10 |
|
|
D24.1 |
PU |
M10 |
|
|
D25.1 |
Prototype of ICT modules for the on-board driver information strategies |
CO |
M26 |
|
D25.2 |
Prototype of ICT module for the on-board charging system alignment |
CO |
M26 |
|
D25.3 |
Prototype of ICT module for the off-board charge planning system |
CO |
M26 |
|
D26.1 |
PU |
M14 |
|
|
D26.2 |
Verification tests and results for ICT solutions |
CO |
M30 |
|
D32.1 |
PU |
M7 |
|
|
D33.1 |
PU |
M9 |
|
|
D33.2 |
PU |
M9 |
|
|
D33.3 |
PU |
M10 |
|
|
D34.1 |
Specifications document |
CO |
M15 |
|
D35.1 |
PU |
M20 |
|
|
D36.1 |
Prototype on-road charging solution 1 |
CO |
M27 |
|
D36.2 |
Prototype on-road charging solution 2 and 3 |
CO |
M27 |
|
D36.3 |
Feasibility assessment for applying prototype solution 4 to other use cases |
PU |
M27 |
|
D36.4 |
Feasibility assessment for applying prototype solution 5 to other use cases |
PU |
M27 |
|
D36.5 |
Feasibility assessment for applying prototype solution 5 to other use cases |
PU |
M27 |
|
D37.1 |
PU |
M28 |
|
|
D37.2 |
PU |
M28 |
|
|
D42.1 |
Assessment of the technical feasibility of ICT and charging solutions |
PU |
M6 |
|
D43.1 |
PU |
M6 |
|
|
D43.2 |
PU |
M6 |
|
|
D44.1 |
Analysis of the current grid infrastructure, new needs and requirements for test sites |
RE |
M10 |
|
D44.2 |
Technical specifications, architecture and design of solutions for grid adaptation |
RE |
M15 |
|
D44.3 |
Implemented grid adaptations per test site |
CO |
M24 |
|
D45.1 |
Analysis of the road infrastructure and requirements for test sites |
RE |
M12 |
|
D45.2 |
Technical specifications and design of solutions for road adaptation |
RE |
M17 |
|
D45.3 |
Implemented road adaptations per test site |
CO |
M24 |
|
D46.1 |
Vehicle prototypes |
CO |
M28 |
|
D46.2 |
Integrated test sites |
CO |
M28 |
|
D46.3 |
Results of verification tests of integrated system |
RE |
M30 |
|
D47.1 |
PU |
M24 |
|
|
D47.2 |
Validation of the FABRIC integrated systems |
RE |
M42 |
|
D52.1 |
Feasibility study on societal perspectives towards on road charging |
PU |
M18 |
|
D52.2 |
PU |
M18 |
|
|
D53.1 |
PU |
M32 |
|
|
D53.2 |
Technical specifications of construction of E-roads |
CO |
M32 |
|
D53.3 |
Technical specifications of maintenance & operations of E-roads |
CO |
M32 |
|
D53.4 |
Detailed LCA/LCC assessment of environment and cost impact of E-roads |
PU |
M40 |
|
D54.1 |
Report on effect of up scaling to vehicle fleet and energy grids |
PU |
M38 |
|
D54.2 |
Report on Maturity, reliability, efficiency and stability of the supply chain |
PU |
M41 |
|
D54.3 |
PU |
M45 |
|
|
D55.1 |
Assessment of traffic operations and management through combining ITS and on-road charging |
PU |
M40 |
|
D55.2 |
Cost-benefit analysis and business models of large-scale deployment of on-road charging |
PU |
M40 |
|
D55.3 |
Environmental life-cycle assessment and scenario analyses for achieving environmental targets |
PU |
M46 |
|
D55.4 |
Analysis of deployment scenarios, standardisation and harmonisation |
PU |
M48 |